文章详细信息 关键词: 工程造价;;影响因素;;成本;;工期;;质量 [gap=429]Keywords: project cost,influencing factor,cost,time limit for a project,quality
基于36个网页-相关网页
Based on the above mentioned framework, the total objective of engineering project is divided into three sub-objectives-time limit for a project, cost, and quality.
同时,构建工程项目工期、成本、质量求解模型,建立多目标优化方程。
参考来源 - 基于协同理论的工程项目多目标优化研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The time limit for a project has the characteristic of time value.
工程的工期具有时间价值。
It has obtained the economic result of technology of economizing the cost, shortening time limit for a project.
采用该结构取得了节约成本、缩短工期的技术经济效果。
There are, at present, three difficulties in western countrysides, such as short of funds, great difficulty in construction and long time limit for a project.
阐述了目前西部农村建桥的三大困难:建桥资金缺、施工难度大、建设工期长;